Closed

Foothill-Canyon SD Phase 1 - Crossing University Ave (Invitation To Bid)

Description: Work generally includes, but is not limited to 1 LS of mobilization and demobilization; 255 SF of remove concrete sidewalk, driveway and waterway; 85 LF of remove concrete curb and gutter; 125 CY of udot roadway excavation; 10 TN of udot 1/2" hmhma, pg 76-34; 85 LF of udot type b1 concrete curb and gutter; 175 sf of concrete sidewalk, 5" thick; 1 EA of cast iron detectable warning panel; 126 LF of 36" rcp storm drain pipe, class iv; 53 LF of 36" rcp storm drain pipe, class iii; 1 EA of 2" fiber optic loop; 8 SY of remove asphalt concrete; 24 CY of untreated base course t-patch; etc, see attachd file.

Buyer
City of Provo

City · UT, US

Released
-
Closes
Oct 14, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts