Utah Tech University - Road Scholar Site Remodel RFP
Posted
Oct 1, 2026
Oct 22, 2026
Work includes remove and legally dispose of the existing training house on the east side of the site, including its slab and footings. Remove associated debris and unsuitable material and backfill and compact the excavation for the proposed improvements. Remove trees, other vegetation, and existing landscape rock within the east and north perimeter work areas shown on the demolition drawing. Remove existing curb and gutter and affected pavement as necessary for the new work. Protect the perimeter wall, adjacent structures, the tower, and facilities to remain; etc, see attached files.