VPS #5 Group N Septic To Sewer Project RFP
Posted
Sep 30, 2026
Oct 22, 2026
Work includes installation of 4" PVC sewer laterals, the decommissioning of the onsite residential septic tanks, connecting into the existing sewer lateral located at the right-of-way of each residence and restoration of the work area.

