"No Parking" Signs (Request for Quotation)
Posted
Oct 13, 2026
Nov 5, 2026
Requesting quotations for "no parking" signs in accordance to the lbpud needs and/or fund availability.
Track open bid opportunities, contracts, public meetings, and key contacts for Long Beach Utilities.
Active opportunities open for bidding
Posted
Oct 13, 2026
Nov 5, 2026
Requesting quotations for "no parking" signs in accordance to the lbpud needs and/or fund availability.
Posted
Oct 13, 2026
Nov 10, 2026
Requesting quotations for gloves in accordance to the lbpud needs and/or fund availability.
Posted
Oct 9, 2026
Oct 20, 2026
The Long Beach Public Utilities Department is requesting quotations for welding supplies, parts, and repair services on an as-needed basis to support its operations. The contractor must provide the materials, tools, parts, equipment, and labor, including routine and emergency repairs at both LBPUD and contractor sites. The listed items include Norton Type 16 grinding cones, and the contract period is November 1, 2026 through October 31, 2027.
Key metrics and characteristics
City
The city where this buyer is located.
Long Beach
County
The county where this buyer is located.
Los Angeles
Address
Physical address of this buyer.
1800 East Wardlow Road
Zip Code
Postal code for this buyer's location.
90807
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Board meetings and strategic plans from Long Beach Utilities
The Water Resources Plan by Long Beach Utilities Department aims to enhance water system resiliency and ensure a sustainable, reliable, and affordable drinking water supply for the Long Beach community through 2050. It focuses on forecasting water demands, assessing supply reliability, and recommending strategies to ensure clean, safe, and high-quality water, deliver services sustainably and cost-effectively, provide reliable service across the service area, increase system resiliency during disruptions, and protect the environment through multi-benefit projects.
The Master Facilities Plan for the Long Beach Water Reclamation Plant outlines the Los Angeles County Sanitation Districts' strategic direction for wastewater management and reclamation through 2050. It provides population, flow, and load projections for the plant's tributary area. The plan meticulously reviews current and future regulatory requirements, identifying constituents of concern such as temperature, chronic toxicity, ammonia, and emerging contaminants like PFAS and microplastics, and proposes strategies for compliance across surface water discharge, potable, and non-potable reuse. Furthermore, it assesses the existing facilities, performance, and capacity of the plant's unit processes, highlighting potential limitations and guiding future infrastructure improvements to ensure efficient and compliant operations.
Public-sector contacts connected to Long Beach Utilities.
Native sync to Salesforce & HubSpot
This Urban Water Management Plan for the Long Beach Utilities Department outlines the city's water management strategy, water supplies, and demand projections through 2050. It details efforts in water use and conservation, the reliability of groundwater, recycled water, and imported water, and includes a comprehensive water shortage contingency plan. The plan emphasizes ensuring long-term water reliability and sustainable use through various demand management measures, including waste prevention, metering, conservation pricing, public education, and infrastructure improvements.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Long Beach Utilities meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership