Closing soon

T-Bone Ranch Detention Pond Improvements RFP

Description: Improvements to the existing subdivision detention pond. Structural work includes the excavation and removal of approx 95 LF of existing 18" HDPE storm pipe, fabric, and concrete debris. Addition parameters feature grading, earthwork subgrade preparation, setting Type I and Type II granular bedding, and installing a new stormwater conveyance system featuring 274 CY of Type M 12" rip-rap and 252 CY of Type VH 24" rip-rap lined swales. Operational requirements encompass utility coordination, implementing temporary traffic control, construction dewatering, and final turf restoration seeding and mulching across disturbed areas.

Buyer
City of Greeley

City · CO, US

Released
Sep 18, 2026
Closes
Oct 19, 2026(3 days left)

RFP documents

Solicitation files and supporting documents for this bid.

RFP documents aren’t available here yet.

Our team can help you find the original solicitation documents.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts