Posted
Sep 29, 2026
Oct 21, 2026
Main Street Reconstruction Phase 2 RFP
The project will reconstruct existing roadways to allow two travel lanes, one two-way left turn lane, and bike lanes. Other work includes replacement of curb and gutter, construction of sidewalks with tree wells, LED pedestrian and street lighting, upgrade of storm drainage, joint utility trench, upgrade to watermain, upgrade of curb ramps to ADA guidelines, and modifications/upgrading of traffic signals including installation of accessible pedestrian push buttons and installation of optical fiber and connection.
