Work under this Contract consists of the construction of a fully functional potable water high service pump station with an installed capacity of 3,300 GPM, along with a 1.2 million gallon ground storage tank and all site, work, connections and appurtenances included for each. Additional off-site work includes rehabilitation of one existing underground revenue meter vault, replacement of one existing revenue meter vault with an above ground pre-fabricated structure, and the construction of two pressure regulating valve stations, housed within above ground pre-fabricated structures.