CityUT
Posted
-
Oct 16, 2026
Steeplechase Lift Station Upgrade Project (Request for Proposal)
Work consists of lift station upgrade, includes bypass pumping set up, operation of system bypass and removal of bypass set up once new equipment is installed and operational; removal of the old vault, pumps, controls, piping, valves and appurtenances; install new precast concrete vault provided by others including hatch, ladder and drain with duckbill check valve; remove existing piping including within the existing wet well; remove existing pumps, pump base and guide rails; furnish, install new 3" pvc piping and fittings; furnish, install new 3" di pipe and fittings; furnish, install new 4" di pipe and fittings; re-locate and install existing 3" mag flow meter; core and grout all pipe penetrations on new valve vault and existing wet well; 220 sf of Asphalt pavement restoration.