CityON
Posted
Sep 29, 2026
Oct 28, 2026
Description: The City of Burlington seeks qualified consultants to undertake a multimodal study and functional design for Lakeshore Road. The study covers the downtown corridor from Maple Avenue to Torrance Street and will identify a preferred multimodal configuration. The resulting functional design will advance the Preferred Integrated Network in the Council-approved 2023 Integrated Mobility Plan.
City · ON, CA
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Burlington (City).
Adjacent opportunities open for bidding right now.
CityON
Posted
Sep 29, 2026
Oct 28, 2026
The City of Barrie seeks a qualified consulting engineering firm with expertise in municipal roads, culverts and watercourse crossings. The assignment concerns the functional design of the Welham Road extension from Mapleview Drive East to the city’s southern boundary. The selected consultant will establish a preferred alignment, functional design and protected land envelope for the extension.
Utah Division of Purchasing and General Services
State AgencyUT
Posted
Sep 25, 2026
Oct 16, 2026
Provide: a study to establish a baseline framework for non-functional turf management and conduct a deep-dive technical and economic case study on one set of selected public or private institutions (e.g., several university campuses, a municipal facility network, a school district, etc.).
Utah Division of Purchasing and General Services
State AgencyUT
Posted
-
Jun 30, 2027
The Great Salt Lake Advisory Council seeks a contractor to conduct a comprehensive study on non-functional turf across one Utah public institution.
CityAB
Posted
Oct 8, 2026
Oct 29, 2026
The City of Lloydminster requests proposals for a functional study of the West End Reservoir and associated water distribution infrastructure. The study will identify current and future constraints affecting reservoir filling and evaluate operational or infrastructure changes. Its findings will inform a data-driven strategy for future capital planning and investment.