Posted
Oct 13, 2026
Nov 4, 2026
CDRER00775 / CDRER00848 / CDRER00849 - ANC Vertical Infrastructure Earthquake Repairs RFP
This federally funded contract includes all work required for the construction of facility repairs caused by the 2018 earthquake at International Airport (ANC). The work is separated into three distinct packages, one each for the South Terminal, North Terminal, and Field Maintenance Building. The contract includes two (2) additive alternates for removal and replacement of flooring in a portion of the Field Maintenance Building.
