CityMS
Posted
Oct 15, 2026
Nov 19, 2026
Waterline Replacement Along Us Highway 11 RFP
Work includes waterline replacement.
Description: Mobilization; construction surveying; 140 ton, foundation conditioning material, minor structures; 430 sy, foundation conditioning geotextile; 20 ton, incidental stone base; 20 ton, asphalt plant mix, pavement repair; 50 sy, geotextile for drainage.
StateAgency · NC, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityMS
Posted
Oct 15, 2026
Nov 19, 2026
Work includes waterline replacement.
Ohio Department of Transportation
State AgencyOH
Posted
-
Oct 29, 2026
Work includes for improving various sections in accordance with plans and specifications by blasting and excavating a rock slope, installing concrete barrier, grading, repairing the shoulder, and related work. Major items feature 1,935.000 FT of concrete barrier removed; 113.000 FT of guardrail removed; 212,436.000 CY of excavation, as per plan; 688.000 CY of embankment; 20,575.000 SY of presplitting, as per plan; 112.500 FT of guardrail, type MGS; 1,661.000 FT of fence, type 47; 2,008.000 FT of concrete barrier, single slope, type D, as per plan; 240.000 hours of scaling; 1,823.000 SY of pavement planing, asphalt concrete; 114.000 CY of aggregate base; 76.000 CY of asphalt concrete surface course; and 2,050.000 FT of rumble strips, shoulder (asphalt concrete).
Special DistrictTN
Posted
Oct 15, 2026
Oct 30, 2026
Work includes approx 6,500 LF of 8" C900 PVC water lines via excavation.
Illinois Department of Transportation
State AgencyIL
Posted
Oct 2, 2026
Nov 6, 2026
Work includes approx 1,480 CY earth excavation: 87 CY removal and disposal of unsuitable material: 79 CY trench backfill: 4,434 SY topsoil furnish and place, 4". See outside link.
Decision makers connected to this RFP from North Carolina Department of Transportation.