CityMN
Posted
Sep 16, 2026
Oct 15, 2026
2027 Balcerzak Water Tower Rehabilitation
Water Tower reconditioning, including complete removal and replacement of all exterior, interior wet, and interior dry coating systems.
Find open Rehabilitation RFPs from state agencies, local governments, school districts and higher ed institutions.
20 opportunities shown.
CityMN
Posted
Sep 16, 2026
Oct 15, 2026
Water Tower reconditioning, including complete removal and replacement of all exterior, interior wet, and interior dry coating systems.
Western Mun Water Dist Of Riverside
Special DistrictCA
Posted
Sep 24, 2026
Oct 26, 2026
Invites qualified firms to submit bids for primary clarifier #2 rehabilitation.
CityTX
Posted
Oct 1, 2026
Oct 22, 2026
Work includes 523 SY removing concrete (curb & gutter); 140,271 EA cement; 11,995 EA d-gr hma ty-d pg64-22 (1.
CityPA
Posted
Sep 6, 2026
Oct 15, 2026
The project is for bridge and culvert rehabilitation at six locations.
Special DistrictAR
Posted
Oct 9, 2026
Nov 18, 2026
Project consists of the replacement of existing airport rotating beacon, east airfield taxiway lighting, signs, cabling, and existing vault equipment, including constant current regulators and owner furnished ALCMS control equipment.
Village of Hempstead Housing Authority
Special DistrictNY
Posted
Oct 10, 2026
Nov 23, 2026
Facade rehabilitation at houses.
CityNJ
Posted
Oct 12, 2026
Nov 10, 2026
Rehabilitation Program Administrator.
Alabama Department of Transportation
Special DistrictAL
Posted
Oct 9, 2026
Nov 6, 2026
Work includes removal of old bridge, partial, station, steel reinforcement for bridge superstructure, approx 3,090 pounds, steel reinforcement for bridge superstructure, approx 3,090 pounds, bridge substructure concrete, bridge concrete superstructure, station 367+51.
School DistrictOR
Posted
Oct 12, 2026
Nov 4, 2026
McKenzie School District seeks proposals from qualified engineering firms for the seismic rehabilitation of McKenzie Elementary School.
CountyFL
Posted
Sep 21, 2026
Oct 22, 2026
The work to be done consists of repairing or rehabilitating the sewer lift station, including essential bypass pumping, wet well restoration, replacement of damaged structural, mechanical, and electrical components, and final site restoration as directed.
CityAL
Posted
-
Oct 30, 2026
Work inlcudes chlorination system replacement, rehabilitation and media replacement for three (3) pressure filters, and associated water treatment facility rehabilitations.
CityVA
Posted
-
Nov 10, 2026
Project includes the renovation, rehabilitation, and partial reconstruction of the existing one-story brick structure for conversion into a restaurant facility with indoor dining, private dining rooms, lounge areas, kitchen space, restrooms, and exterior dining/bar functions.
CityWI
Posted
-
Oct 20, 2026
Cured-in-place-pipe sewer lining either by spot lining or complete lining of reaches of sewer.
Virginia Department of Transportation
State AgencyVA
Posted
Oct 13, 2026
Nov 18, 2026
This Invitation for Bids seeks contractors for B35_2027 BRIDGE REHABILITATION in Pulaski County, from 0.40 miles from the intersection of Route 693 to 1.65 miles from the intersection of Route 670.
Special DistrictTX
Posted
-
Oct 14, 2026
Civcast identifies project ID 9171.323 as a Marine Construction procurement owned by the Calhoun Port Authority, not a grant program.
Parker Water And Sanitation District
Special DistrictCO
Posted
Sep 16, 2026
Oct 14, 2026
Parker Water & Sanitation District is soliciting bids for the rehabilitation of Twenty Mile Road’s sewer infrastructure under this IFB.
Cape Fear Public Utility Authority
Special DistrictNC
Posted
-
Oct 27, 2026
Rehabilitation services are being procured for the Wrightsboro Elevated Water Tank.
CityCA
Posted
Sep 25, 2026
Oct 23, 2026
Installation or replacement of approx 2,700 LF of water distribution piping at various locations throughout the city to improve City of Folsom water system operations, including pipe, appurtenances, water meters, and backflows to meet city standards.
Special DistrictIL
Posted
Sep 4, 2026
Oct 22, 2026
Construction services for a new bridge on the north side of the existing bridge to support the second track.
Special DistrictDE
Posted
Sep 24, 2026
Nov 17, 2026
The Wilmington Regional WWTP Digester 4 Rehabilitation project includes the replacement of the existing floating cover with a new fixed type digester cover, upgrades to process control, instrumentation and internal digester piping.